Mercury – Nashville, TX

Managed $5 million storm damaged renovation project and loss settlement process.

    • Aviation, Disaster Reconstruction

MRI managed this $5 million storm damaged renovation project and the loss settlement process. MRI developed the scope of repair for settlement, estimated repair costs, obtained subcontractor bids, administered subcontracts, and audited payment applications. MRI functioned as the general contractor for this work and helped develop the settlement scope of work documents that were used to settle the claim. Some of the issues encountered included asbestos abatement of the roof deck before a new roof system could be installed. An engineering evaluation coupled with the city-approved re-design drawings, established the need for additional life safety components, such as fire alarms and strobes to meet current requirements. Replacement of all electrical equipment and devices was needed to be in compliance with current codes. MRI worked with the owner to pre-plan the repair work in detail in order to minimize the impact to ongoing terminal operations.