Mercury, Nashville, TX

MRI managed this $5 million storm damaged renovation project and the loss settlement process. MRI developed the scope of repair for settlement, estimated repair costs, obtained subcontractor bids, administered subcontracts, and audited payment applications. MRI functioned as the general contractor…

Mercury Addison

This project was sensitive because continued jet maintenance was required while the roof was being replaced. MRI was the general contractor for this project which resulted from large hail that ruined the roof. MRI replaced the roof is sections which…

Mercury Ontario

MRI was the Construction Manager for the remodeling of the 65,000 square foot National Guard hangar complex into an aircraft maintenance facility.  All the exterior siding was replaced because of lead paint and asbestos abatement was required.  The interiors were…

Mercury Reno

For this wind storm loss, MRI mobilized and implemented emergency repairs.  MRI personnel evaluated the damage and developed a scope for repair.  Damaged HVAC equipment was removed and replaced, a code compliance study was performed and the necessary code upgrades…

United Airlines World Headquarters

When a fire swept through the UA office complex, MRI was called to help manage the reconstruction, restoration, and loss settlement process.  Acting as the Program Manager for this $25 million renovation, MRI planned and scheduled the recovery work, and…

Nisshin Gulf Coast

When Nisshin Gulf Coast needed a new office building, MRI was retained to provide a turn-key solution for their requirements. The building was constructed on an actual cost basis with the detailed budget being based on competitive lump sum subcontractor…

Bayfront Condominium

MRI was the General Contractor for the $5.2 million complete renovation of this 27 unit custom condominium. Regulatory compliance and code upgrades were required because previous hurricane damage was not repaired correctly. Extensive rot was also found throughout the building…

Downtown Building

Islamic Daawah.  MRI provided project management services to the Owner, Hakeem Olajuwon to establish the scope, schedule, and estimated cost to transform this historic 40,000 square foot bank building into an educational center.  The scope of work included replacement of…

Marmon

When a defective flush valve caused water to flood this Chicago office building,  MRI determined that drying, restoration and specialized electronic equipment cleaning was needed.  A rapid response procedure included the packing of contents, blocking furniture and immediate water extraction. …