Edge Condominium

MRI evaluated this midtown midrise building for slow motion collapse.  Thirty columns around the building were failing and pulling away from the building due to overloading of the shallow footings.

Inner Loop Residence

MRI was retained to complete the design build of a 3,800 square foot contemporary custom home in the River Oaks area.  MRI worked with the owner from day one to develop the perfect floor plan and program for their home. …

Serento Condominiums

MRI constructed this 6 story concrete and wood framed 44 unit condominiums.  Part of the cast-in-place concrete two story parking structure is below grade and four stories of wood framing sit atop the concrete parking structure.  Typical condominium finishes, life…

Piney Point Residence

MRI was asked to complete the construction of this 10,000 square foot, luxury home after half the foundation was finished.  As the General Contractor we evaluated the existing structural issues, completed the architectural design, met all the necessary requirements of…

58 Briar Hollow Condominium

MRI was the Design/Build Manager for this luxury condominium.  We managed the engineering, design, permitting and inspection process for this 4 story, light gauge steel framed condominium project. MRI planned, scheduled, estimated and supervised the work.  Quality materials were used…

3100 Richmond, Houston, TX

This 5 story, approximately 54,000 square feet office building was damaged by Hurricane Ike.  Managed Response, Inc. developed the damage and repair scope report and the repair cost estimates.  We performed an exterior cladding engineering analysis which established the need…

Gulf Greyhound Park

MRI was retained to assist with the damage evaluation assessment and engineering analysis required for the insurance claim following Hurricane Ike of this 230,000 plus square foot commercial entertainment facility.  MRI clearly illustrated that the damage present was caused by…

Palisades Palms

MRI was retained to provide an engineering analysis and evaluation required for the insurance claim following Hurricane Ike of this 27 story dual tower private condominium resort consisting of 288 units.  The claim was made that the exterior building envelope…

Shearn Moody Plaza

MRI provided professional engineering analysis and evaluation of possible wind related damage after Hurricane Ike.  Evaluated any necessary repairs required to restore the exterior building envelope and interior spaces to its pre-storm condition.

4300 Scotland

After a car fire in their parking garage caused damage to this three story office building, MRI provided the damage assessment and repair cost estimate, and expedited the insurance claim settlement.  We also performed emergency response cleaning and stabilization, solicited…