ROLLOVER IMAGE
MRI was the general contractor for this $600,000 project which, being near the gulf, had to be constructed to 130 miles per hour wind speeds. Features of the building include the following.
• All site work including fencing, grading and drainage
• Surveying and site layout for proper construction
• Steel building designed for 130 mph winds
• Interior wood framed walls and mezzanine storage level
• High bay lighting and large doors for large boats
MRI prevailed over difficult site conditions and flooding rains to construct this building for TPWD that will be used for their marine lab and boat maintenance.
Texas Parks and Wildlife Marine Lab


