MRI managed this $5million storm damaged renovation project and the loss settlement process. MRI developed the scope of repair for settlement, estimated repair costs, obtained subcontractor bids, administered subcontracts, and audited payment applications. MRI functioned as the general contractor for this work and helped develop the settlement scope of work documents that were used to settle the claim.
Roofs Are Damaged But The Basic StructureIs Left Intact
These photographs show how the hangar and office area roof systems were ripped away by the wind on these and several other buildings. The pictures also show the underlying structure was left intact and with very little damage. The existing roof systems consisted of a corrugated steel deck with a built-up insulated single ply membrane over the deck. Unfortunately the deck was covered with asbestos containing material on both sides that required abatement. New roof systems were designed, approved by the adjuster, and installed to prevent additional damage.